BRIDGE DATA CENTER
Phase 2 - MV switchgears & transformers – ITC.
Phase 3 - MV switchgears, transformers, E-Houses – ITC.
Phase 4 - MV skid, transformers, LV skid (MSB), E-Houses – ITC.
Phase 5 – B3 - MV & LV skid (MSB) – TC. -
K2 DATA CENTER
Phase 1–3 - Installation of power generator communication and control systems, and testing of generator MV systems. -
EQUINIX DATA CENTER
Phase 1 - Power generators power, communication, control systems installation and LV output testing. -
REFINERY PLANT
Wilmar Projects: Install & commission 33kV GIS, lightning protection, grounding, lighting & power systems; install & commission palm oil mill MV, LV, ELV systems; refurbish 22kV intake MV systems (replace, test & commission). -
COCOA RAW PLANT (AFRICA IVORY PLANT)
GCB COCOA COTE D' IVOIRE: Install & commission LV electrical power, front line instrumentation ELV automation control systems, and extension of production line power & automation control systems. -
WATER TREATMENT PLANT
WTP Intake Plant: Refurbish aged 11/6.6kV MV to new MV GIS systems, testing & commissioning. -
HOLIDAY PLAZA
ENTIRE 22KV SYSTEM DOWNGRADING 11KV SYSTEM REFURBISHING, TESTING, AND COMMISSIONING. -
RESIDENTIAL AND COMMERCIAL
R&F Phase 1 & Opera House: 33kV MV GIS systems installation, testing, commissioning & in-house maintenance.
ELECTRONIC / PRECISION INDUSTRIES
- EPSON PRECISION
- VENTURE PINTARMAS
- VENTURE TECHNOCOM SYSTEM
OTHER INDUSTRIES
- OIL DIVISION PLANT
- POUTRY FARM
- COCOA RAW MAT
- PLASTIC INDUSTRIES
- CHEM. SCHEDULED WASTE RECOVERY
- MOULDING INDUSTRIES